Stimulation Optimization

Stimulation Optimization

Hydraulic stimulation is the most capital-intensive phase of a well completion, typically accounting for over 50% of total completion costs. Given the significant financial impact, efficiency and optimization are critical to ensuring strong project economics and maximizing return on investment.

In an effort to mitigate operational risks, many operators adopt a de-risked approach to stimulation, prioritizing predictable outcomes and operational success. While this strategy provides a higher degree of certainty, it often leads to excessive expenditures and missed opportunities for improved efficiency.

At Tristar, we take a strategic risk management approach, leveraging our team’s deep expertise and data-driven decision-making to push operational limits safely and effectively. Our engineers work to eliminate inefficiencies, refine execution strategies, and optimize pumping schedules—all while maintaining the highest standards of safety and reliability.

By enhancing efficiency, reducing waste, and executing with precision, we help operators achieve the same—or better—stimulation results at a lower cost, driving stronger economic returns without compromising well performance.

How it Works

Our engineers will collaborate with your team ahead of the stimulation to define project goals, assess risk tolerance, and identify any constraints. We will conduct a thorough review of offset and historical fracturing data to pinpoint recurring challenges, inefficiencies, or untapped opportunities. Working alongside your team, we will perform a detailed geological assessment of the wellbore, analyzing formation properties and potential hazards to optimize planning. Finally, we will coordinate with you and the stimulation provider to develop and execute the most effective treatment schedules for precise and efficient proppant placement.

Our engineers will provide 24/7 monitoring throughout the stimulation process, maintaining active collaboration with the stimulation provider and onsite personnel. Leveraging our dynamic approach, we will work to minimize risk while maximizing operational efficiency. Capital efficiency will be achieved through optimized operational time and reduced material consumption, including water, chemicals, and fuel. To ensure full transparency and engagement, our team will deliver daily KPI reporting and progress updates, keeping you informed every step of the way.

After the stimulation is complete, our team will deliver a comprehensive operational and material report, providing detailed insights into performance and efficiency. We will identify key learnings, highlight optimization opportunities, and recommend improvements for future operations to drive continuous enhancement and cost savings.

Service Provided

Pre-Stimulation Planning
  • Client Engagement – Define key objectives, risk tolerance, and operational constraints.
  • Stimulation Review – Conduct an in-depth offset analysis to identify best practices and potential challenges.
  • Geological & Hazard Review – Assess formation properties, pressure regimes, and potential geohazards.
  • Stimulation Design – Develop a tailored treatment schedule based on reservoir characteristics and operational goals.
  • 24/7 Fracture Monitoring – Active engineering oversight to maximize efficiency and mitigate risks.
  • Dynamic Treatment Schedules – Adaptive execution strategies to optimize proppant placement and fluid efficiency.
  • Fluid Quality Control– Monitor and adjust fluid chemistry, viscosity, and proppant loading in real time.
  • Proppant Loading Optimization – Adjust proppant concentrations and ramp schedules for efficient fracture conductivity.
  • Downhole Pressure Surveillance – Track treating pressure trends to detect screen-outs, pressure spikes, or formation breakdown.
  • On-the-Fly Adjustments – Modify pump rates, pad volumes, or stage designs based on real-time data and well response.
  • Wireline & Pumpdown Optimization – Minimize stage cycle times by improving plug setting, perforation efficiency, and pumpdown synchronization.
  • Stage-to-Stage Efficiency Tracking – Measure average stage times, non-productive time (NPT), and treatment consistency.
  • Live Offset Well Monitoring – Prevent frac hits and unwanted interwell communication.
  • Daily KPI Reporting & Progress Tracking – Ensure performance transparency and identify improvement opportunities.
  • Operational Efficiency Review – Evaluate stage times, downtime, and overall completion efficiency.
  • Proppant & Fluid Utilization Analysis – Compare actual usage against planned volumes to refine future designs.
  • Pressure & Rate Performance Assessment – Identify fracture propagation efficiency and reservoir response.
  • Offset Well Communication Analysis – Review interwell interactions and validate mitigation strategies.
  • Identification of Future Improvements – Leverage data insights to enhance subsequent completion designs.
  • Customized Optimization Recommendations – Provide targeted adjustments to maximize future well performance and cost efficiency.

Why Choose Tristar?

Maximize your well’s potential with Tristar’s expert stimulation optimization. Our data-driven approach enhances efficiency, reduces costs, and improves well performance. Partner with us to achieve superior results—contact Tristar today to optimize your next completion!

2024 Operational Summary

Wells Supervised
0
Stages Optimized
0
Tonne of Proppant Placed
0 K
Average Water Reduction
~ 0 %
Increase in Operation Efficiency
~ 0 %

Sign Up